Surface Finish Workplace

Want create site? Find Free WordPress Themes and plugins.

A subject of the feasibility study was building of a new workplace for surface finish of rail vehicles, and unfinished vehicle bodies. A suggested building capacity  120 pcs of rail vehicles per year. The building consisted of a part from the painting box, blasting box, and preparation units for pretreatment of the vehicle body surface. This also includes a project technological part and technical units /compressor plant, paints preparation unit, offices, and sanitary equipment. Rough ground shaping of the construction site : built-up area 2,517 m2, built-round area 34,500 m3. Estimated investment cost  – CZK 90-100 mil. Excl. VAT.

CLIENT: ŠKODA VAGONKA a.s.
PROJECT IMPLEMENTATION: 09/2016 – 11/2016

WORK SCOPE:

  • Feasibility Study, consultancy.