Industrial Complex Adygeja, Russian Federation

Want create site? Find Free WordPress Themes and plugins.
CLIENT: Adygea, Russian Federation
PROJECT IMPLEMENTATION: 2009

b

WORK SCOPE:

A complete design of the industrial zone Kamennomostskij in the Republic of  Adygea, Russian  Federation, and  Feasibility Study  for the factory manufacturing gypsum and gypsum products. The Feasibility Study and design for a transport terminal of building materials.

The industrial zone consists of : terminal (3×600, 000 t/year) and car base, brickworks Tribopress (6.2 million bricks/year),  manufacturing plant for production of slaked lime (30, 000 t/year, manufacturing plant for production of lime  (30-50, 000 t/year) and gypsum products  (4 – 8, 000 t/year), factory for manufacturing of gas silicate blocks (2, 000 m3/day), cement works  (500, 000 t/year) and power block of the industrial zone. Technical and economic parameters were set in two differing variants depending on location of several factories.

Did you find apk for android? You can find new Free Android Games and apps.