Extension of the Administration Premises and Parking Areas

Want create site? Find Free WordPress Themes and plugins.

An office inbuilt that extends the capacity of the existing administration building is made as a steel   bridge at premises of the current production hall at a level of the 2nd floor. A design lays emphasis on delicacy and clearness of the steel structure that indicates industrial  atmosphere. The inbuilt is connected to the existing office rooms by connection waists, one of them already existing, the other one newly built. In terms of operation,  they are mostly open space offices which capacity is up to  80 employees.

Within the project, also the parking area was extended by 1, 210 m2, which means  60 parking lots.

CLIENT: Bang & Olufsen, s.r.o.
PROJECT IMPLEMENTATION: 2013

WORK SCOPE:

  • Building permit documentation.
Did you find apk for android? You can find new Free Android Games and apps.