Desulphurization of Waste Gases of the 660MW Block in the Ledvice Power Station
Want create site? Find Free WordPress Themes and plugins.
The Ledvice Power Station burns up brown coal of calorific value 11 – 13 MJ/kg from the Bílina coal mines. Technoprojekt provided consultation engineering including the basic design coordination. The design addressed the unit of the output of 660 MW equipped with a wet waste gases desulphurization technology.
CLIENT: | ČEZ a.s. |
PROJECT IMPLEMENTATION: | 2008 – 2014 |
WORK SCOPE:
- Consultation engineering + coordination basic design;
- Technical supervision.
Did you find apk for android? You can find new Free Android Games and apps.