Desulphurization of Waste Gases of the 660MW Block in the Ledvice Power Station

Want create site? Find Free WordPress Themes and plugins.

The Ledvice  Power Station burns up brown coal of calorific value  11 – 13 MJ/kg from the Bílina coal mines. Technoprojekt provided consultation engineering including the  basic design coordination. The design addressed the unit of the  output of 660 MW equipped with a wet waste gases desulphurization technology.

CLIENT: ČEZ a.s.
PROJECT IMPLEMENTATION: 2008 – 2014

WORK SCOPE:

  • Consultation  engineering + coordination basic design;
  • Technical supervision.
Did you find apk for android? You can find new Free Android Games and apps.