Replacement of Existing Electro Separators in the Opatovice Power Station

Want create site? Find Free WordPress Themes and plugins.

A building scope design was based on the location of the required technological equipment for solid pollutants separation. Existing electric separators are replaced by cloth filters in four boilers of six boilers at the  Opatovice Power Station. A part of the work is also the replacement of exhausters and other auxiliary technological equipments  needed to separate solid pollutants in this way. The project is a part of the “Opatovice Ecological Program , in which Technoprojekt, a.s. prepared, in addition to the mentioned project, also building permit documentations for the following projects:

Retrofit of the existing desulphurization  (variant 2 – new desulphurization) and reconstruction of the desulphurized waste gases stack (DESOx).

Retrofit of the boiler room (DENOx) .

CLIENT: United Energy Invest, a.s.
PROJECT IMPLEMENTATION: 2013 – 2016

WORK SCOPE:

  • Building permit documentation;
  • Author´s supervision.
Did you find apk for android? You can find new Free Android Games and apps.