News

Ecological Improvement of the Boilers K2, K3, K4 in the Třebovice Power Plant

Technoprojekt prepared a Tender documentation for a choice of contractor. The aim of the executive project was to complete documentation of flue gas ducting to desulphurization of the boilers  K2, K3 and K4 in the Třebovice Power Plant.

CLIENT: Dalkia Česká republika, a.s.
PROJECT IMPLEMENTATION: 2012 – 2014

WORK SCOPE:

  • Tender documentation.

Reduction of Emissions of Solid Pollutants, NOx and SO2 on the Boiler K14, Heating Plant E3

A new boiler following the existing 3 functional boilers in the heating plant. Technoprojekt prepared the planning permit documentation, the building permit documentation which included engineering, and, further, provided also a new boiler trial operation, including commissioning.

CLIENT: ENERGETIKA TŘINEC, a.s.
PROJECT IMPLEMENTATION: 2013 – 2015

WORK SCOPE:

  • Planning permit documentation;
  • Building permit documentation;
  • Arrangement of trial operation and building commissioning.

Natural Gas and Oxygen Supply from the Mixing Station at the Blast Furnace Canteen to the Foundry Blast Furnace No. 2

A key subject of the action was to prepare a design documentation for execution of  new natural gas and oxygen connection pipes at the area of the company ArcelorMittal Ostrava. A subject of the design documentation is  new natural gas and oxygen supply from the mixing station at the blast furnace to the foundry blast furnace number 2. The newly supplied media will serve us in putting into operation a new (oxygen-fuel) torch igniter of the blast furnace No. 2 which installed input is  3.5 MW.

The particularly designed documentation consists of the natural gas and oxygen inlet piping, and the design of the control line of natural gas and oxygen for the torch igniter of the blast furnace number 2. The total length of the installed piping is 70 m.

CLIENT: ArcelorMittal Ostrava a.s.
PROJECT IMPLEMENTATION: 2015

WORK SCOPE:

  • Building execution documentation.

Desulphurization of Waste Gases of the 660MW Block in the Ledvice Power Station

The Ledvice  Power Station burns up brown coal of calorific value  11 – 13 MJ/kg from the Bílina coal mines. Technoprojekt provided consultation engineering including the  basic design coordination. The design addressed the unit of the  output of 660 MW equipped with a wet waste gases desulphurization technology.

CLIENT: ČEZ a.s.
PROJECT IMPLEMENTATION: 2008 – 2014

WORK SCOPE:

  • Consultation  engineering + coordination basic design;
  • Technical supervision.

Desulphurization of Waste Gases of the 660MW Block in the Ledvice Power Station

The building scope was based on the project to reduce discharge  NOx  concentrations in waste gases of brown coal burning boilers. A set of primary and secondary measures to denitrification allowing their further operation according to legal requirements effective since 2016 had to be made in four of the six boilers at the Opatovice Power Station. The project is a part of the “Opatovice Ecological Program“. In addition to the mentioned project,  Technoprojekt, a.s. prepared also building permit documentations for the following projects:

Retrofit of the existing desulphurization  (variant 2 – new desulphurization) and reconstruction of the desulphurized waste gases stack (DESOx).

A replacement of existing electro separators.

CLIENT: United Energy Invest, a.s.
PROJECT IMPLEMENTATION: 2013 – 2016

WORK SCOPE:

  • Building permit documentation,
  • Author´s supervision.

The building scope was based on the project to reduce discharge  NOx  concentrations in waste gases of brown coal burning boilers. A set of primary and secondary measures to denitrification allowing their further operation according to legal requirements effective since 2016 had to be made in four of the six boilers at the Opatovice Power Station. The project is a part of the “Opatovice Ecological Program“. In addition to the mentioned project,  Technoprojekt, a.s. prepared also building permit documentations for the following projects:

Retrofit of the existing desulphurization  (variant 2 – new desulphurization) and reconstruction of the desulphurized waste gases stack (DESOx).

A replacement of existing electro separators.

CLIENT: United Energy Invest, a.s.
PROJECT IMPLEMENTATION: 2013 – 2016

WORK SCOPE:

  • Building permit documentation,
  • Author´s supervision.

Replacement of Existing Electro Separators in the Opatovice Power Station

A building scope design was based on the location of the required technological equipment for solid pollutants separation. Existing electric separators are replaced by cloth filters in four boilers of six boilers at the  Opatovice Power Station. A part of the work is also the replacement of exhausters and other auxiliary technological equipments  needed to separate solid pollutants in this way. The project is a part of the “Opatovice Ecological Program , in which Technoprojekt, a.s. prepared, in addition to the mentioned project, also building permit documentations for the following projects:

Retrofit of the existing desulphurization  (variant 2 – new desulphurization) and reconstruction of the desulphurized waste gases stack (DESOx).

Retrofit of the boiler room (DENOx) .

CLIENT: United Energy Invest, a.s.
PROJECT IMPLEMENTATION: 2013 – 2016

WORK SCOPE:

  • Building permit documentation;
  • Author´s supervision.