News

Center of Technical Insulations in Bohumín

A project priority was new organization of storage, production and transport within the existing manufacturing premises.  The most significant building element are new additional buildings to the central warehouse. The former central warehouse was reconstructed to the manufacturing  Off-Line Hall, increased by a new built-in unit at the west side.

CLIENT: ROCKWOOL, a.s.
PROJECT IMPLEMENTATION: 2013 – 2014

WORK SCOPE:

  • Building permit documentation,
  • Tender documentation,
  • As-built documentation,
  • Author´ s supervision.

ON 2nd NOVEMBER, 2016, THE GENERAL MEETING OF THE COMPANY TECHNOPROJEKT, A. S. ADOPTED A RESOLUTION ON SHARES CONVERSION

23.11.2016

On 2. 11. 2016, the general meeting of the company Technoprojekt, a. s., registered office  Ostrava – Moravská Ostrava, Havlíčkovo nábřeží 2728/38, Postcode 702 00, Identification Number  278 10 054, adopted the following resolution on shares conversions:

In accordance with a provision of § 529, Civil Code, the general meeting decided to converse all shares issued by the Company  to shares entered into books. It was determined a term for the shares to  be submitted to the Company in a period of two months from a day of the decision publication. Simultaneously with the shares handover to the Company, the shareholder is obliged to report the Company his/her number of the assets account kept with some participant of the central depository the shares are to be registered in. The statutory Director of the Company is authorized to take any and all steps needed to entering the Company´s shares in books.

 

Technoprojekt, a. s.

Ing. Martin Zuštík, Statutory Director


M. ZUŠTÍK VISITED A PARTNER SNP – TECHNICAL SERVICES IN CANADA, WINDSOR

21-1-300x169[1]

20.07.2016

On 2. 5. 2016, a meeting took place on a plan of cooperation for  2016 and 2017 with a long-term partner SNP – Technical Services that represents our Company in the USA, and operates our subsidiary company  BEI.Architects & Engineers. At the conclusion of the year, we expect a visit by the President of the  Company, Mr. Santiago N. Pablo, in the Czech Republic. The visited Company presents the expertise aimed to technological  processes optimization in the automotive industry.


JEREMY WOOLF, MANAGING PARTNER, TOGETHER WITH M. ZUŠTÍK, VISITED ONE OF OUR SIGNIFICANT CONSTRUCTIONS FOR MORAVIACANS, BOJKOVICE

20-1-300x169[1]
M. Zuštík a J. Woolf

20.07.2016

On 21. 6. 2016, the leading partner and Director of the long-term partner company  ABBARCH from Canada, Vancouver, visited us to negotiate our cooperation for the next period. A part of the three-day stay was also a visit at one of our reference constructions where execution takes place. At the visit, Mr.  Woolf appreciated the attitude of our architects to design the industrial building, and, generally, a top quality of civil engineering works.