Surface Finish Workplace
With respect to the requirement to change the production assortment of the existing machinery production, the investor has defined terms of reference to the modification of technological workplaces. The Feasibility Studies evaluated include legislative requirements and environment impact assessment. The building area of 11,571 m2 manufacturing and warehouse premises.
CLIENT: | ŠKODA VAGONKA a.s. |
PROJECT IMPLEMENTATION: | 2014 – 2017 |
WORK SCOPE:
- Feasibility Study, consultancy.
Assessment of the Surface Finish Workplace
A subject of the feasibility study was the building of a new workplace for surface finish of rail vehicles, and unfinished vehicle bodies. A suggested building capacity 120 pcs of rail vehicles per year. The building consisted of a part of the painting box, blasting box and preparation units for pretreatment of vehicle body surface including a project technological part and technical units /compressor plant, paints preparation unit, offices, and sanitary equipment. Rough ground shaping of the construction site : built-up area 2,517 m2, built-round area 34,500 m3. Estimated investment cost – CZK 90-100 mil. Excl. VAT.
CLIENT: | ŠKODA VAGONKA a.s. |
PROJECT IMPLEMENTATION | 2016 – 2017 |
WORK SCOPE:
- The Environment Impacts Assessment (EIA) including engineering, completion of the Noise Study, Dispersion Study, health risks assessment.
Building of the Manufacturing Factory MOBIS Lamp Shop in Mošnov
A subject of the documentation was the building of a new factory for manufacturing of lamps for cars. Technoprojekt performed a complex design documentation including EIA studies.
CLIENT: | Mobis Automotive System Czech s.r.o. |
PROJECT IMPLEMENTATION: | 2014 – 2016 |
Rozsah prací:
- Planning permit documentation,
- Building permit documentation,
- Tender documentation,
- Building execution documentation,
- Complex engineering.
Extension of the Halls M1C, M1D (part Kecerovce) and Shelter at the Hall M1F
Within unification of the structural designs of the halls and easy connection, a part of the hall was removed, followed by extension of the two remaining halls.
CLIENT: | ŠKODA AUTO a.s. |
PROJECT IMPLEMENTATION | 2014 – 2015 |
WORK SCOPE:
- Building permit documentation (DSP);
- Building execution documentation (DPS);
- As-built documentation(DSPS);
- Author´s supervision by the designer (AD);
- Technical supervision by the investor (TDI);
Logistic Area of the Storage Halls
A subject of the building is a logistic area comprising three storage halls intended for in-handling, storage and dispatch of automotive industry products.
CLIENT: | Panattoni Czech Republic Development s.r.o. |
PROJECT IMPLEMENTATION | 2014 – 2015 |
WORK SCOPE:
- Planning permit documentation,
- Engineering to the planning permit procedures.
Distribution and Warehouse Centre at the Area of the Company Lasselsberger
The new building serves as storage for finished products at storages of two types – block and rack storage halls. A part of the block storage hall is also a three-level administration built-in unit including backgrounds for employees and Center management.
KLIENT: | LASSELSBERGER, s.r.o. |
REALIZACE PROJEKTU: | 2014 – 2016 |
WORK SCOPE:
- Planning permit documentation;
- Building permit documentation;
- Building execution documentation;
- Engineering to the planning permit procedures, building permit procedures.
Horizontal Cutter Base
A completion of documentation for execution of the building part of a foundation structure for mechanically technological equipment of the building – upper cutter Škoda HCW1-160, installed in order to make the manufacturing process in existing halls of the company Huisman Konstrukce s.r.o. more efficient.
CLIENT: | Huisman Konstrukce, s.r.o. |
PROJECT IMPLEMENTATION: | 2014 |
WORK SCOPE:
- Engineering and geological surveying of the building site,
- Building execution documentation.